Del Norte Triplicate

It’s the Tunnel! The route for Last Chance Grade has been selected.

D
Del Norte Triplicate
June 23, 2024 at 09:00 PM
1 min read
2 years ago
District 1 Cal Trans Director Matt Brady has announced the proposed route over the troubled 101, south of Crescent City has been confirmed. The proposed two mile tunnel route labeled Alternative F at an estimated cost of $1.3 billion, has been selected. The announcement was made late Tuesday afternoon at the Yurok Tribal Council Office ribbon cutting of the Hunter/ Panther completed Bridge project, just north of Klamath. #placement_573654_0_i{width:100%;max-width:550px;margin:0 auto;}var rnd = window.rnd || Math.floor(Math.random()*10e6);var pid573654 = window.pid573654 || rnd;var plc573654 = window.plc573654 || 0;var abkw = window.abkw || '';var absrc = 'https://ads.empowerlocal.co/adserve/;ID=181918;size=0x0;setID=573654;type=js;sw='+screen.width+';sh='+screen.height+';spr='+window.devicePixelRatio+';kw='+abkw+';pid='+pid573654+';place='+(plc573654++)+';rnd='+rnd+';click=CLICK_MACRO_PLACEHOLDER';var _absrc = absrc.split("type=js"); absrc = _absrc[0] + 'type=js;referrer=' + encodeURIComponent(document.location.href) + _absrc[1];document.write('');Cal Trans projects a completion date for the tunnel for 2038. googletag.cmd.push(function() { googletag.display('ad-1515727'); });

Community Discussion

Join the conversation about this article.

This discussion is about the full content. Please respect the original source and use this for educational discussion only.

Please log in to start or join discussions.

Article Details

Published June 23, 2024 at 09:00 PM
Reading Time 1 min
Category general